HETSCO served as the contractor for the relocation and construction of a 550 TPD air separation plant from Vineyard, UT to Tupman, CA and provided the following services:
- Bracing and Supports for PHX Box, N2 Superheater Box & Column Box
-
Relocate Compressor Motors, Cryogenic Storage Tanks, Automatic Valves and Instrumentation, Dust Filter, DCA, Piping.
- Remove/Erect PHX (48'/148,900 lb.), N2 Superheater (67'/75,000 lb.), Column Package (100'/107,000 lb.)
- Provided Engineering Calculations and Drawings for Dismantling and scrapping Argon Column
- Provided Transportation for all Equipment
- Relocate and Install Turbine Expander with Modifications
- 2 Dimensional Alignment and structurally modified PHX, Columns, & Ducts to meet Seismic Requirements
- Extensive Piping Modifications to N2 Column for Process Requirements
- Removal and Modifications to Column Trays and Downcomers
- Grouting of PHX and Column
- Pressure Testing of PHX, Superheater, Column and all Associated Piping
- Oxygen Cleaning of necessary Piping
- NDT of Weld Requirements to B31.3